by Breia Monti | Aug 10, 2022
The existing Nanaimo Regional General Hospital (NRGH) Thermal Energy Centre had reached the end of its operational life span. Kinetic was contracted to perform renovation work and new construction of the facility. The new thermal energy centre replaced the existing...
by Breia Monti | Jun 23, 2022
This project included a 440 m² (4,700 sqft) visitor centre with an attached 185 m² elliptical exhibit room. The exposed timber and glulam structural system along with the lofty open areas of the visitor centre creates a very warm and welcoming atmosphere. The...
by Breia Monti | Mar 24, 2022
Ten years ago, Kinetic was engaged as the General Contractor to undertake the renovations to the pool deck and change rooms at the Strathcona Gardens Aquatic Centre. The facility’s management wished to have the pool and change rooms finished and re-opened to the...
by Breia Monti | Mar 24, 2022
The scope of this project involved the addition and renovations to the existing municipal recreation centre. Features of the project included new studios and main entry, renovations to washrooms, change rooms, administration offices, and related areas. Kinetic...
by Breia Monti | Mar 24, 2022
Originally built and opened in 1905, the CPR terminal was expanded to a larger building to replace the original terminal in the early 1920’s. Throughout its history it housed the CPR steamship passenger terminal, the Royal London Wax Museum and in 1975 it was sold to...