Fortis BC, Regional Operating Centre

Fortis BC, Regional Operating Centre

The project is a new 21,000 sq ft building. Concrete footings and foundations walls with slab-on-grade, steel structure with insulated metal panel cladding and 2nd floor steel deck with concrete topping. The project was designed and constructed to include many...
Maritime Museum Building Upgrades

Maritime Museum Building Upgrades

Kinetic was the selected contractor to undertake this project, the upgrade of a landmark building in Vancouver while it was occupied and fully open. Notably, this museum houses the exhibit of the St. Roch arctic exploration vessel and other historical artifacts that...
Comox Waterfront Marina Park

Comox Waterfront Marina Park

The project included construction of 2 new community-use buildings, new plaza and pathways, improvements and extension of an existing waterfront boardwalk, and upgrades to an existing washroom building.  Both sail buildings include kitchens, washrooms, and...
Port Hardy Airport Terminal Building Replacement

Port Hardy Airport Terminal Building Replacement

This project consisted of the phased removal of the existing Port Hardy Airport terminal building and the construction of the new one, to meet sustainable building standards on the same site. The airport remained operational for the duration of construction. The first...