by Breia Monti | Jul 23, 2022
Kinetic performed work for an addition and remodel to Blue Grouse Winery, one of the first bonded wineries on Vancouver Island, outside Duncan, BC. The project added one level and a mezzanine (6,228 sq ft) to the existing winery. To do so, Kinetic salvaged a portion...
by Breia Monti | Mar 24, 2022
Kinetic was engaged to build this four-storey residential building with 34 units and two sets of townhouses with 8 units, for a total of 42 residences to be made available as affordable rental housing for single mothers and their children, as well as older women who...
by Breia Monti | Mar 24, 2022
Project Description:The project involved the construction of a new eight-classroom addition to the existing school. The proposed two-storey addition consisted of a steel structure with a slab on grade lowest floor, steel deck upper floor and steel deck roof. Five...
by Breia Monti | Mar 24, 2022
Kinetic built this a administrative office building for university executive and support staff located within the University’s campus. The total size of this facility located is 42,000 square foot split into two storeys. The building is a concrete structure with wood...
by Breia Monti | Mar 24, 2022
Kinetic built this three-storey wood frame assisted living residence with 25 units and the adjoining single storey complex care facility with 32 beds. It features commercial kitchen, dining rooms, lounges, laundry facilities, activity rooms, bathing rooms, and...