by Breia Monti | Mar 24, 2022
The scope of this project involved the addition and renovations to the existing municipal recreation centre. Features of the project included new studios and main entry, renovations to washrooms, change rooms, administration offices, and related areas. Kinetic...
by Breia Monti | Mar 24, 2022
The project is a new 21,000 sq ft building. Concrete footings and foundations walls with slab-on-grade, steel structure with insulated metal panel cladding and 2nd floor steel deck with concrete topping. The project was designed and constructed to include many...
by Breia Monti | Mar 24, 2022
This project consisted of the conversion and renovation of a 2-story wood frame structure formerly used to store row boats into a vibrant multi-purpose space. Once completed, this building became the setting for Aboriginal student ceremonies, counselling and teaching...
by Breia Monti | Mar 24, 2022
The project entailed a new 13,000 sqft two-storey addition to an existing community centre, interior renovations and modernization, as well as a complete building envelope remediation to the existing buildingās exterior. The new addition is of wood-frame heavy timber...
by Breia Monti | Mar 24, 2022
Kinetic was the selected contractor to undertake this project, the upgrade of a landmark building in Vancouver while it was occupied and fully open. Notably, this museum houses the exhibit of the St. Roch arctic exploration vessel and other historical artifacts that...