by Breia Monti | Dec 30, 2022
The Canadian Coast Guard Hardy Bay was a three-part project consisting of the removal of existing buildings, installation of a new dock with extensive marine works, and construction of the new 16,000 sq. ft building. The Logistics Depot includes dedicated...
by Breia Monti | Nov 15, 2022
The project developed 0.76 ha (1.8 acres) of new parkland at the southwest end of the Johnson Street Bridge as an expansion to the existing park. The park has been designed in collaboration with the Songhees and Esquimalt Nations and includes feedback from community...
by Breia Monti | Mar 24, 2022
This project consisted of the conversion and renovation of a 2-story wood frame structure formerly used to store row boats into a vibrant multi-purpose space. Once completed, this building became the setting for Aboriginal student ceremonies, counselling and teaching...
by Breia Monti | Mar 24, 2022
The project included construction of 2 new community-use buildings, new plaza and pathways, improvements and extension of an existing waterfront boardwalk, and upgrades to an existing washroom building. Both sail buildings include kitchens, washrooms, and...
by Breia Monti | Feb 9, 2022
This project consisted of the phased removal of the existing Port Hardy Airport terminal building and the construction of the new one, to meet sustainable building standards on the same site. The airport remained operational for the duration of construction. The first...