TUNNEL FIRE DOORS REPLACEMENT

April 2015 Feenstra Architecture Inc.

This project involved phased repair and replacement of damaged fire doors in a lower level service tunnel within the hospital. The work included extensive repair work to the existing doors and frames, installation of additional bollards and security cameras for the prevention of further damage and the work was completed in the evenings and on only one half of the tunnel at a time to avoid disruption to daily hospital services.

 

JACK BELL VIVARIUM CAGE AND TUNNEL WASH RENOVATION

July 2016 Feenstra Architecture Inc.

The two phase project involved the removal of the old tunnel washer and installation of the new one, existing services (including mechanical and electrical) were upgraded and some exploratory demolition was performed to determine pre-existing pit conditions and the conditions  discovered determined the method of installation for the tunnel washer.

The second phase began after the first phase was completely commissioned and involved relocating hoarding to surround the neighbouring cage washer, which was then demolished and a new cage washer was installed. Several walls were relocated and floors reinstated and the walls and ceilings received a specialty coating to enable staff to wash all areas of the room.

 

BC CANCER CENTER, 5TH FLOOR LABORATORY

February 2016 Rocky Point Engineering

This project involved renovation of a number of lab work stations and installation of a biosafety cabinet complete with new mechanical connections.