Esquimalt Graving Dock Retaining Wall

Client: Public Works Canada
Prime Consultant: Klohn Crippen Berger
Completion: May 2011

This project consisted of building a retaining wall to accommodate expansion to the east end of the Graving Dock. Work included extensive shoring of excavated bank with rock anchors, soldier piles, and reinforced concrete. The retaining wall was constructed with 1 meter thick reinforced concrete and rock anchors down to the bedrock.