click for larger image
|
Seismic Upgrading to CPR Steamship Terminal - Victoria, BC
- Client: Provincial Capital Commission
- Prime Consultant: Iredale Consultants
- Completion: November 2011
Structural Seismic Upgrading to Historic Building on Victoria’s Inner Harbour. Seismic work includes installation of rock anchors, seismic concrete shear walls, and steel brace frames. Related work includes mechanical and electrical safety upgrades and refurbishment of building exterior.
|
|
|
 Old Firehall GalleryLast Updated On: 6/14/2011 - Completion: July 2005
- Gross Floor Area: 1,000 m2
- Client: City of Courtenay
- Prime Consultant: William Fisher Architect
Seismic upgrade and renovations to convert an existing fire hall to accommodate a new art gallery. This project consisted of converting the old Courtenay Fire Hall into the Comox Valley Centre for the Arts. Following a seismic upgrade to the building and the construction of a new exterior façade, the existing building was gutted to allow for the construction of a new gallery, offices, retail space and public use areas. Site improvements included a rock wall, new unit paving and improved access to the building.
 Saanich FirehallLast Updated On: 6/14/2011 - Completion: December 2008
- Client: Municipality of Saanich
- Prime Consultant: Peterson Galloway Engineers
This project consisted of a seismic upgrade and minor renovations to the existing Saanich Firehall #3. A complete seismic overhaul of the building was performed to ensure its sustainability as a post disaster emergency response centre.
 Sanscha Community Cultural CentreLast Updated On: 11/29/2011Client: Sidney & North Saanich Memorial Society Prime Consultant: Ladi Holovsky Architect Completion: September 2001 Gross Floor Area: 2,300 m2 Location: Sidney, BC
Construction of a new community cultural centre including a 300 seat theatre, exhibition hall, activity rooms, and renovations to the existing community hall. This project is a wood frame, single storey, slab on grade structure, with a vaulted roof structure, masonry and cedar shingle exterior, built up and asphalt shingled roof, and high quality interior finishes.
 CPR Terminal AdditionLast Updated On: 11/29/2011Client: Provincial Capital Commission Prime Consultant: Chow Fleischauer Architects Completion: May 2003 Gross Floor Area: 200 m2
Elevator and stairwell addition to the historic CPR Terminal Building on Belleville Street. This project involved a 3 storey steel framed addition with glazed curtainwall cladding. Existing Wax Museum on lower 2 floors of existing building remained in operation throughout construction. Work was performed on a construction management basis. Kinetic is also the Construction Manager on the seismic upgrade and restoration, completed in 2011.
 Colwood FirehallLast Updated On: 11/29/2011 - Client: City of Colwood
- Prime Consultant: Carl Peterson Architect
- Completion: July 2006
- Gross Floor Area: 2,100 m2
This project consisted of a seismic upgrade and addition to the existing Colwood Firehall. A complete seismic overhaul of the two-storey wood framed building was performed to ensure its sustainability as a post disaster emergency response centre. As well, additional truck bays were added, along with increased office space, shower facilities and a new high-tech alarm centre. All work completed in a fully operational facility.  Victoria City Hall Renovations, Phase 1Last Updated On: 11/29/2011 - Client: City of Victoria
- Prime Consultant: Chow & Fleischauer Architects Completion: November 1999
- Gross Floor Area: 1,800 m2
Seismic upgrading of heritage building involved removal of load bearing masonry brick walls and installation of new support beams, load bearing walls and strengthening of floor structure. Renovations included new cashier and public information areas. Work was completed in fully occupied building with minimal disruption to City Hall operations.  Buoy Maintenance Facility BuildingLast Updated On: 11/29/2011 - Client: Public Works Canada, Canadian Coast Guard
- Prime Consultant: Public Works Canada
- Location: Victoria, BC
- Completion: April 1999
- Gross Floor Area: 1,300 m2
Construction of a new Buoy Maintenance Building at the Victoria Coast Guard Base. This steel frame building accommodates specialized buoy maintenance equipment used to sandblast, repair and paint buoys and other navigational equipment used by the Canadian Coast Guard. Foundation construction required the use of a “Dynamic Compaction” process to the building footprint to prepare the otherwise unsuitable site to accommodate the proposed building. Significant precautions were taken so that the large repetitive compaction forces did not damage the adjacent structures on the base. The buoy maintenance equipment is relatively unique and was custom designed for this building. Significant coordination was required with the equipment supplier to ensure the building could accommodate the equipment and the layout was functional.  Air Traffic Control Towe - Victoria International Airport, BCLast Updated On: 11/29/2011 - Client: Public Works and Government Services Canada
- Prime Consultant: Irwin Kew Architects
- Completion: November 1988
- Gross Floor Area: 2,200 m2
Construction of an air traffic control tower at Victoria International Airport. Facilities within this building included air traffic control operations center and a training facility for air traffic controllers. This project involved the use of complex structural steel work for the control tower cab, use of high performance glazing and Glasweld exterior panels. Advanced radar and communication systems were installed into this control tower. This building was constructed adjacent to an active taxiway and flight training school.  Aircraft Wash Facility – CFB ComoxLast Updated On: 11/29/2011 - Client: Department of National Defence
- Prime Consultant: Jensen Group Architects
- Completion: July 1998
- Gross Floor Area: 2,600m2
Design and construction of a new aircraft hangar to automatically wash and rinse the Aurora, Hercules, and Buffalo aircraft. Building is a clear span pre-engineered building with standing seam metal roof, metal wall cladding, and epoxy paint finishes. This facility has a fully automated wash and rinse system that ensures that the optimal amount of soap and water is used for each aircraft.  Access Control Building - CFB Comox, BCLast Updated On: 11/29/2011Client: Defence Construction Canada Prime Consultant: Defence Construction Canada Completion: May 2009 Gross Floor Area: 200 m2
Security Access Control Building at CFB Comox. Building constructed of cast-in-place concrete and concrete block construction with steel framed roof.
 Interior & Exterior Renovations to Federal BuildingLast Updated On: 11/29/2011 - Client: Public Works and Government Services Canada
- Prime Consultant: Irwin Kew Architects
- Completion: December 1994
- Gross Floor Area: 21,000 m2
Seismic upgrade and interior and exterior renovations to the former main postal operations building. This six-storey building was completed renovated to change its use to retail on the main floor and offices on the upper floors. Seismic upgrading of this building involved underpinning and bracing the existing foundations, installation of rock anchors in the basement and construction of new concrete shear walls for the entire height of the building.  Renovations to Dockyard Building 100, CFB EsquimaltLast Updated On: 11/29/2011 - Client: Defence Construction Canada
- Prime Consultant: Stantec
- Completion: September 2011
- Location: CFB Esquimalt - Victoria, BC
Mechanical System Upgrades to Dockyard Building 100. Work includes demolition of ceilings, structural upgrading and supports, complete new mechanical system, related electrical work, and refurbishment of ceilings. Work is undertaken in fully occupied building.  Little River Ferry Terminal Seismic UpgradeLast Updated On: 11/29/2011Client: BC Ferry Services Prime Consultant: Herold Engineering Completion: April 2011 Location: Comox, BC
Seismic Upgrade to Ferry Terminal. Work includes demolition, structural seismic upgrading, and restoration of finishes. Work undertaken in occupied facility.  Comox Valley Waste Depot, Weigh Scale InstallationLast Updated On: 11/29/2011 - Client: Comox Valley Regional District
- Prime Consultant: McGill & Associates
- Completion: May 2011
- Location: Courtenay, BC
Installation of Truck Weigh Scales and related work at the Waste Management Centre. Work includes replacement of incoming and outgoing weigh scales, retaining walls, storm drainage, site lighting, and paving.  Horseshoe Bay Terminmal Overhead WalkwayLast Updated On: 11/29/2011 - Client: BC Ferries
- Prime Consultant: Clive Grout Architect
- Completion: June 2011
- Location: Horseshoe Bay, BC
Construction of new Overhead Passenger Walkway at Horseshoe Bay Ferry Terminal. Work includes new concrete stairwell, elevator, and two-span steel walkway structure. Walkway will connect vehicle loading area to existing overhead walkway at Passenger Terminal and Horseshoe Bay Village.
|
|
|
|
|

click for larger image

|
University of Victoria – Fountain & Plaza
- Completion: April 1994
- Client: University of Victoria
- Prime Consultant: Vaughan Landscape Planning & Design
Construction of a fountain and surrounding plaza on the University campus. This feature fountain and plaza is located in front of the McPherson Library and is a focal point for the inner campus buildings. High quality architectural concrete weir walls and planters abut large blasted rock boulders resulting in a unique fountain design. A large reflecting pool and seating with benches and planters surrounds the pool.
|
|
|
|
|
|
|

click for larger image

|
Rotary Welcome Garden
- Completion: April 2005
- Client: Rotary Club of Victoria
Construction of a new park at the entrance to the Ogden Point cruise ship terminal at Dallas Road. The Rotary Club of Victoria spearheaded this beautification project at the entrance to Ogden Point. Working together with the Rotary Club, Butchart Gardens, and the City of Victoria; Kinetic completed construction of the new park, transforming a simple gravel path to community park with stamped coloured asphalt, planting fountains, curved guardrails and an appreciation wall.
|
|
|
|
|
|
 |
Camosun College Fountain Plaza
- Completion: 2006
- Gross Floor Area: 11, 000sf
- Client: Camosun College
- Prime Consultants: Carl E. Peterson Architect Inc.
In the role of Construction Managers, project consisted of a new main plaza fountain with perimeter hard landscaping and bench seating area.
|
|
|
|
|
|
 |
Pemberton Memorial Garden
- Completion: 2007
- Client: Vancouver Island Health Authority
|
|
|
|
 |
|
|
|
|
|
|
|